Nagpur - Seoni Express Way Private Limited (Formerly Nagpur - Seoni Express Way Limited) is a Design, Construction, Development, Finance, Operation and Maintenance of the work of rehabilitation and upgrading to 4/6 lane from Km 596+750 to Km 624+480 on NH-44 (Old NH-7) in the state of Madhya Pradesh under North-South Corridor (NHDP-Phase-II program) on BOT (Annuity) Basis. It is a Contract Package on NS-I/BOT/MP-3.
The Govt. of India (GOI) through Ministry of Road Transport & Highways (MoRTH) is contemplating to enhance the road capacity and safety for efficient transhipment of goods as well as passenger traffic on the heavily trafficked National Highway sections. GOI has entrusted National Highways Authority of India with the responsibility of augmenting the capacity of highway corridors. The project under consideration aims at developing a four lane divided carriageway standards for North-South corridor in Seoni District in Madhya Pradesh
The National Highway No. 44 (Old NH-7) starts from Varanasi and ends of at Kanyakumari after traversing a distance 2369 Km approximately. The proposed package starts from Km 596.750 of NH-44 (Start of Seoni Bypass) and ends at Km 624+480 of NH-44 (Mohgaon). As per scope, the total project length is 56.475 Km out of 56.475 Km, the completed length is 27.730 Km and balance 28.745 Km is not handed over because of non-Clearance from MOE&F.
Copyright © 2024 NSEWPL - All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.